Friday 13 Jan 2017

Railway bridge on Cambuslang Road, Rutherglen set for revamp

Network Rail will be carrying out a 14 week programme of work to renew and strengthen the railway bridge over the A724 Cambuslng Road, Rutherglen. The road will beclosed to enable work to be delivered safely and a sign-posted diversion will be in operation throughout.

Download

IMG_7962.JPG
3264px * 2448px
2.54 MB
Railway bridge on Cambuslang Road, Rutherglen set for revamp: Network Rail will be carrying out a 14 week programme of work to renew and strengthen the railway bridge over the A724 Cambuslng Road, Rutherglen.  The road will beclosed to enable work to be delivered safely and a sign-posted diversion will be in operation throughout.